Gallery: Reach Lode Bridge opening day
The new Reach Lode bridge on the Lodes Way forms a key link in the new route for NCN11 opened on 12 September 2010.
At the start of White Fen on a ride to open the new bridge at Reach Lode
Opening of Reach Lode Bridge on the new NCN11
The newly opened bridge at Reach Lode on the rerouted NCN11
Opening the new Reach Lode bridge
The new Reach Lode bridge on the Lodes Way, the new route for NCN11 opened on 12 September 2010.
* Items marked with an asterisk [*] are required fields and must be fully completed.