Donate using PayPal

Gallery: Tins Bridge abortive lifting into place

Tins bridge being lifted into place, only to find it doesn't fit

This gallery was created on Tuesday, 15th March 2011

Tins bridge being lifted into place (1)

Tins bridge being swung into place (2)

Tins bridge being lifted into place (4)

Tins Bridge turns out to be too long - or more likely, the abutments weren't put in correctly. They'll have to take out some big chunks of reinforced concrete and re-lay them, then try again. All fixed in #30171.

Oh how embarrassing. The new bridge over the Tins is lifted into place, only to find it is about 40cm too long.

Even though it wasn't constructed properly, the lifting of the bridge gives a good impression of what the new cycleway will look like at The Tins

Even though the bridge isn't right you can see what the new cycleway along the Tins will look like now

Before they lowered it into place they feared it was going to be too big....

We welcome your feedback, especially to report bugs or give us route feedback.

My comments relate to: *






Your comments: *
URL of page: * https://tyldesley.cyclestreets.net/galleries/185/
How did you find out about CycleStreets?:
Your name:
Our ref: Please leave blank - anti-spam measure

* Items marked with an asterisk [*] are required fields and must be fully completed.