Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | a725, bridge, doubleback, footbridge, junction, m74, newbuild, path, raithinterchange, ramp, shareduse, strathclydepark |
Date time: | 12.27pm, Sunday 1st April, 2018 |
Time line: | Earlier | Later |
Facing: | South west |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Cumbernauld |
No option for taking a shortcut down the embankment from the footbridge. Pedestrians have to walk this unnecessary distance too!
Comments reflect the views of the original submitter only.